Site of new MIP lift tower and elevated link walkway to the rear of Platform 1 - note the sheet piling to retain the embankment fill which is supporting the track
Site of new MIP lift tower and elevated link walkway to the rear of Platform 1 - note the sheet piling to retain the embankment fill which is supporting the track
Hainault SAP
LU Engineering @ fotopic.net
The lift shaft was sunk from platform level down to 3m below ticket hall level below and the shored up by bolted concrete segmentsPrevious | NextReinforcement Bar Fixing