The lift shaft was sunk from platform level down to 3m below ticket hall level below and the shored up by bolted concrete segments
Added on 16th June 2007, has been viewed 98 times
(2 this year, 2 this month, 1 this week, 1 today)
© 2009 SK - All rights reserved.