The lift shaft was sunk from platform level down to 3m below ticket hall level below and the shored up by bolted concrete segments
The lift shaft was sunk from platform level down to 3m below ticket hall level below and the shored up by bolted concrete segments
Hainault SAP
LU Engineering @ fotopic.net
View of platform 2 from the ramp end note the tight clearances to the trackPrevious | NextSite of new MIP lift tower and elevated link walkway to the rear of Platform 1 - note the sheet piling to retain the embankment fill which is supporting the track

Rate this photo!
110
Current rating: 0.0 (0 votes)
Added on 16th June 2007, has been viewed 98 times
(2 this year, 2 this month, 1 this week, 1 today)