Catch pit |
Longitudinal Timber & Phillips Rail Anchor |
Current Section Gap |
Longitudinal Timber Transom |
Arc Suppression Ramp & Trainstop |
Track Mounted Lubricator Harrow on the Hill |
Hainault Depot |
Hainault Depot Roads |
Stanmore |
Stanmore sidings |
Jumbo Greaser Embankment N/B Platform Northern Line |
Harrow-on-the-Hill |
Harrow-on-the-Hill |
Track Crossing over Pipework |
Conductor Rail Longitudinal Timber Support Pedestal |
P20 Ceramic Insulator Pot |
74kg/m Conductor Rail |
Emergency Trainstop Equipment |
95lb/yd Bullhead Rail & Panlock key |
113lb/yd Flat Bottom Rail & Pandrol clip |
Pan L6 Baseplate FB rail fastening |
Benkler 4 hole insulated block joint |
Signal Gantry |
Rayners Lane cable run / embankment |
| | | |